Summit Constructors, Inc.
Prepared reinforced concrete and drilled pier
footing design plans and backup structural calculations for
Peiner SK-415 tower crane integrated into structural slab
at Miramar WWTP Upgrade Project in San Diego, CA
Harris
Salinas Rebar Company
Designed tiered picking frame design for 40’-diameter
rebar cage to allow for placement around bridge columns at
new San Francisco-Oakland Bay Bridge Project
West
Bay Builders
Prepared multi-tiered rigging design for
lifting 70’-tall reinforcement cages from horizontal to vertical,
and placement at pier footing. In addition, designed
stability templates, and phased reinforcement cage guying
plans for three lift towers at new SF-Oakland Bay Bridge
Project.
Waco
Scaffolding & Equipment
Prepared multi-floor structural shoring system
to transmit tower crane footing loads through three floors
of RC slab at Laurel Bay Apts. Project in San Diego, CA.
Coker
Equipment Company
Prepared Liebherr tower crane footing design
for footing sandwiched between structural building wall
and retaining wall at Municipal Court Project in Reno,
NV.
Kiewit-FCI-Manson,
JV.
Designed barge-mounted rebar fabrication template,
first lift guying system, and second and third lift internal
steel support frame at new SF-Oakland Bay Bridge Project.
Sandvick
Equipment & Supply, Inc.
Prepared various tonnage capacity picking
beam design plans and structural calculations for various
projects throughout southern California and Arizona. |