
Archer
Western Contractors, Ltd.
Designed box girder bridge falsework system
spanning over operating trolley line, for new overpass in
San Diego, in accordance with Caltrans’ Falsework Design
manual.
Waco
Scaffolding & Equipment
Prepared designs in Oregon, Washington,
Nevada, and California including systems for many large
scale and multiple-floor concrete structures.
Las Vegas
Paving Corp.
Designed falsework systems for multi-span
box girder highway bridges in accordance with NVDOT, and
custom overhang bracket at deck support for bridge widening
project.
Mercer Fraser
Company
Multi-span box girder highway bridge falsework
design in accordance with Caltrans’ Falsework manual
for various bridges in Northern California.
TC Shoring & Scaffolding
Designed falsework systems for concrete
placement for large diameter tanks at various water treatment
plants, and pump stations in Sacramento and Central California.
PERI Formwork Systems, Inc.
Prepared concrete formwork and falsework designs for walls, beams, slabs, ramps, etc. on multiple projects throughout Washington, Oregon, California, and Texas. Designed floor reshore layouts for numerous high rise buildings, accommodating construction and formwork schedules.
J.F. Shea Construction
Created falsework design plans for water treatment plants in Orange County as well as other miscellaneous projects throughout California.
Keystone Structural Concrete, Ltd.
Provided reshore design plans for multistory concrete buildings in Texas to allow for safe progression of concrete floor placement while allowing construction access and worker accessibility on lower completed floors.
|