
Danny’s Construction Company, Inc.
Prepare ~160’-tall custom and prefabricated structural shoring and bridge jacking towers at the new SF-Oakland bay bridge project with each tower supporting ~500,000 lb during bypass structure truss bridge construction.
Division
Two Construction, Inc.
Prepared emergency structural shoring design for 5-story
1930’s reinforced concrete office building in downtown
Oakland, CA. Shoring allowed for demolition and reconstruction
of (4) damaged columns at the first floor level.
Waco
Scaffolding & Equipment
Designed multi phase shoring system to allow for new footing
construction and moment frame installation for 100-year
old brick office building in Pasadena, as well as needle
beam and roof support systems for over 30 projects in Southern
California.
Safway Steel Products
Inc.
Developed shoring design for occupied Salt Lake City grocery
store during expansion project, to allow for column undermining
and reconstruction.
West Coast Bridge,
Inc.
Prepared bridge jacking, and bracing designs for various
concrete arch bridges in Monterey County, CA, to temporarily
raise structures off of supports and laterally brace during
bearing pad reconstruction.
Serrano & Cone, Inc.
Designed Caltrans’ bridge jacking and lateral bracing design
for various structural steel and concrete bridges throughout Northern California.
Ahmadi Construction
Prepared a Caltrans’ bridge jacking design for the Los Angeles River Bridge
using a low profile hydraulic jacking system.
Soltek Pacific Construction
Prepared foundation to roof shoring for the nine-story
Department of Defense operations building in Monterey,
CA, to permit removal and replacement of major interior
reinforced concrete columns. |